Miele PDR 514 ROP Installation Plan

Typ
Installation Plan

Táto príručka je tiež vhodná pre

PDR914/514 G
Gas heated
en Installation plan Commercial dryer
cs Instalační plán Profesionální sušičky
hu Telepítési terv Ipari szárítógép
pl Plan instalacyjny Suszarka profesjonalna
pt Plano de instalação Secadores industriais
tr Kurulum planı Endüstriyel Kurutma Makinesi
M.-Nr. 11 867 670
2
en ...................................................................................................................................... 4
cs ....................................................................................................................................... 14
hu ...................................................................................................................................... 25
pl ....................................................................................................................................... 35
pt ....................................................................................................................................... 45
tr ........................................................................................................................................ 55
en - Contents
3
Installation notes............................................................................................................. 4
Installation requirements ................................................................................................... 4
Electrical connection......................................................................................................... 4
Gas connection ................................................................................................................. 5
Air intake/exhaust air......................................................................................................... 5
PDR914/514, gas heated................................................................................................ 6
Dimensions........................................................................................................................ 6
Installation ......................................................................................................................... 7
Installation (standard/UG).................................................................................................. 8
Set up (Concrete platform) ................................................................................................ 9
Technical data.................................................................................................................. 10
Voltage variants and electrical data .................................................................................. 10
Gas connection ................................................................................................................. 10
Waste air/gas..................................................................................................................... 10
Air intake............................................................................................................................ 10
Machine data..................................................................................................................... 11
Fixing options.................................................................................................................... 11
Fixing without plinth ...................................................................................................... 11
Fixing to concrete plinth................................................................................................ 11
Options/Accessories ......................................................................................................... 12
Concrete base (on site) ................................................................................................. 12
en - Installation notes
4
Installation requirements
Risk of injury or damage to property due to improper installa-
tion.
Incorrect installation of the tumble dryer can lead to personal injury
or damage to property.
The tumble dryer must only be installed and commissioned by
Miele Customer Service Department or an authorised dealer.
The tumble dryer must be installed in accordance with all relevant
regulations and standards.
The dryer must only be operated in a room that has sufficient vent-
ilation and which is frost-free.
The tumble dryer must not be installed behind a closeable door or
a sliding door. The maximum opening angle of the tumble dryer door
must not be limited by objects or doors. It must be possible to fully
open the tumble dryer door at any time.
Electrical connection
The electrical connection must be established by a qualified electri-
cian.
The electrical connection may only be made to an electrical system
provided in accordance with all appropriate local and national legisla-
tion, regulations and guidelines. Please also observe the regulations
set out by your insurance provider and energy supplier, accident pre-
vention regulations, as well as recognised codes of practice.
Reliable and safe operation of this tumble dryer is only ensured if it
has been connected to the mains electricity supply.
The required supply voltage, power rating and fuse rating can be
found on the data plate on the tumble dryer. Ensure that the supply
voltage matches the voltage quoted on the data plate before estab-
lishing the electrical connection to the tumble dryer.
Connection to a supply voltage other than the one quoted on the
data plate can damage the tumble dryer if the voltage is too high.
If more than one voltage is specified on the data plate, the tumble
dryer can be converted for connection to the relevant input voltage.
This conversion must be performed by the Miele Customer Service
Department or by an authorised dealer. During the conversion, the
wiring instructions given on the wiring diagram must be followed.
The tumble dryer can either be connected with a suitable plug-and-
socket in accordance with IEC60309-1, or where necessary a hard-
wired connection. For a hard-wired connection, an all-pole isolation
device must be available at the installation site.
en - Installation notes
5
An isolation device is a switch which ensures a contact opening of
more than 3mm. These include circuit breakers, fuses and contact-
ors (IEC/EN60947).
If the mains supply cannot be permanently disconnected, the isola-
tion device (including plug and socket) must be safeguarded against
being switched on either unintentionally or without authorisation.
Tip: We recommend connecting the tumble dryer to the power supply
via a plug and socket so that it is easier to conduct electrical safety
checks (e.g. during maintenance or repair work).
The tumble dryer must not be connected to devices such as timers
which would switch it off automatically.
If local regulations require that a residual current device (RCD) is in-
stalled, a typeB residual current device (sensitive to universal cur-
rent) must be used.
Gas connection
The gas connection must only be carried out by a registered installa-
tion technician in accordance with the applicable national regulations
(see installation instructions).
The use of a gas socket is not permitted at the specified heater rating
as the flow rate is too low.
The gas heating is configured at the factory in line with the gas spe-
cifications on the sticker on the rear of the appliance.
If the gas family is changed, a conversion kit must be requested from
the Miele CustomerService Department (please specify the appliance
type, serial number, gas family, gas group, gas connection pressure
and country of installation). Follow the installation instructions. This
conversion may only be carried out by a registered specialist.
Air intake/exhaust air
The tumble dryer may only be operated when the ducting has been
connected properly and the room is sufficiently ventilated.
Accessory parts may only be fitted when expressly approved by
Miele. If other parts are used, warranty, performance and product li-
ability claims will be invalidated.
en - PDR914/514, gas heated
6
Dimensions
906
900 >20>20
Ø 520
650
1400
595 Ø 630
20
1400
752 642
38
67
852
747
1300
1300
747
852
900
906
< 180°
Dimensions quoted in millimetres
en - PDR914/514, gas heated
7
Installation
620 280
90
G
501
305
1600
150
305
1600
~ 50
2 x
150
128
200
EL
AL ZL
ZL
EL
AL
501
G
G
ZL
EL
AL
AL
ZL
161
160
"Z"
"Y"
"Y"
"Z"
XCI
96
31
~350 54
128
Measurements in millimeters
EL Electrical connection
GGas connection
AL Exhaust duct
ZL Air intake
XCI XCI Box/Connector Box (optional)
en - PDR914/514, gas heated
8
Installation (standard/UG)
20
1400
Ø 12
1400
UG
UG 900
B
~ 48
55
747
~ 55
127
Ø 10
~ 65
B
1300
55
790
395
754
900
546
BB
A
A
UG 685
409
818
587
617
B
B
B
BB
B
A - A B - B
Dimensions quoted in millimetres
BDrill hole/anchor point
UG Box plinth
en - PDR914/514, gas heated
9
Set up (Concrete platform)
20
1400
M6 x 20
1400
BS
900
B
~ 48
>55
BS >900
>50
20
Ø 10
B
BS 1300
>55
790
395
754
BS >900
546
BB
C
C
747
463
926
546
651
D
D
B
BB
B
>50
BS
1300
790
55 55
103
395
BS
~55
OFFSHORE
C - C D - D ~ 48
Measurements in inches
BDrill hole/anchor point
BS Concrete plinth
en - Technical data
10
Voltage variants and electrical data
Standard connection
Supply voltage 1N AC 230V
Frequency 50Hz
Power rating 0.6kW
Fuse rating (on site) 10A
Minimum cross-section for connection cable 3×1.5mm²
Cable gland M20
Gas connection
Nominal heat rating 15kW
Machine-side connection according to ISO 7-1
To connect the gas appliance, a corrugated metal hose line made of stainless steel according to DIN3384
must be used. The shut-off device must be provided on-site. Due to an insufficient flow rate, the use of a
gas socket is not permissible with the specified heating output.
½"
Connection thread for natural gas, on-site (internal thread) ½"
Connection thread for liquid gas, on-site (internal thread) ½"
Alternative on-site connection with high-precision steel pipe according to DIN 2391/DIN2393, with smooth
pipe end
Min. connection length
DN12
40mm
Connection pressure according to DIN EN 437. Connection to gas supply must comply with national regulations.
Waste air/gas
Max. nominal air flow in vented mode (PDR9xx only) 620m³/h
Max. nominal air flow (PDR5xx only) 620m³/h
Max. permissible pressure loss 280Pa
Connection on machine side (ext. diameter) 150mm
Connection pipe provided on site (int. diameter) 150mm
Max. temperature 80°C
This tumble dryer is a gas-burning machine without a flow-operated safety device with fan downstream of heat exchanger (technical
design: B22). Waste gas pipework must be pressure-tight. Waste gas connections should be performed in accordance with national
and local regulations and may require approval.
As relative humidity inside the vent ducting can be as high as 100%, suitable measures must be taken to prevent a backflow of con-
densate into the machine.
Air intake
Standard connection: air intake from installation site
Recommended free air intake cross-section into the room:
(equivalent to 3 times the exhaust air cross-section of a machine).
531cm²
There must be sufficient air intake to the installation site to match the air outlet volume.
Alternative connection: air intake connection directly from outdoors
Connection sleeve on machine side (internal diameter) 161mm
Connection pipe provided on site (external diameter) 160mm
Removing the protective cover exposes live parts. For safety reasons, a pipe must be installed from the tumble dryer’s central fresh air
intake (over a minimum length of 900mm) and secured with 2screws.
en - Technical data
11
Machine data
Machine width, total 906mm
Machine height, total 1400mm
Machine depth, total 852mm
Niche width 1250mm
Recommended wall spacing (up to the front edge of the machine) 1300mm
Minimum wall spacing (up to the back edge of the lid) 500mm
Packaging width 1090mm
Packaging height 1526mm
Packaging depth 938mm
Maximum gross volume 1560.2l
Maximum gross weight 173.7kg
Maximum net weight 162.4kg
Max. floor load in operation 1799N
Diameter of exhaust duct 150mm
Drum diameter 850mm
Diameter of drum opening 520mm
Drum depth 480mm
Drum volume 250l
Diameter of door opening 520mm
Maximum door opening angle 180°
Emission sound pressure level 51 dB(A) re 20 µPa
Sound power level 62
Average heat dissipation rate into the room 3.9MJ/h
Permissible ambient temperature range 2–40°C
Fixing options
Fixing without plinth
Quantity Screw size
Tensioning strips 2
Wood screws DIN571 (Ø×length) 2 6×40mm
Plugs (Ø×length) 2 10×50mm
Fixing the appliance in place is absolutely essential.
Fastenings for floating screed must be supplied by the customer on site.
Fixing to concrete plinth
Quantity Screw size
Tensioning strips 2
Wood screws DIN571 (Ø×length) 2 6×40mm
Plugs (Ø×length) 2 10×50mm
If the tumble dryer is being fixed to a concrete plinth on site, fixing in place is absolutely essential.
Fastenings for floating screed must be supplied by the customer on site.
en - Technical data
12
Options/Accessories
Concrete base (on site)
Minimum width 900mm
Recommended height 100mm
Minimum height 50mm
Minimum depth 900mm
The quality of the concrete and its strength must be assessed according to the machine load. The on-site concrete plinth must be fixed
adequately to the floor.
cs - Obsah
13
Pokyny kinstalaci............................................................................................................ 14
edpoklady instalace ....................................................................................................... 14
Elektrické připojení............................................................................................................ 14
Připojení na plyn (jen pro plynem vytápěné varianty)........................................................ 16
Přívod vzduchu/odtah ....................................................................................................... 16
PDR914/514, plynem vytápěné...................................................................................... 17
Rozměry ............................................................................................................................ 17
Instalace ............................................................................................................................ 18
Umístění (standard/UG)..................................................................................................... 19
Umístění (betonový sokl) ................................................................................................... 20
Technické údaje............................................................................................................... 21
Varianty napětí a elektrické údaje...................................................................................... 21
Připojení na plyn................................................................................................................ 21
Odtah/spaliny .................................................................................................................... 21
Přívod vzduchu.................................................................................................................. 21
Údaje přístroje ................................................................................................................... 22
Varianty upevnění .............................................................................................................. 22
Upevnění bez soklu....................................................................................................... 22
Upevnění na betonovém soklu...................................................................................... 22
Volby/příslušenství ............................................................................................................ 23
Betonový sokl (vmístě instalace) .................................................................................. 23
cs - Pokyny kinstalaci
14
edpoklady instalace
Poškození osob nebo věcné škody neodborným umístěním.
Neodborné umístění sušičky může vést ke zranění osob nebo
věcným škodám.
Sušičku smí nainstalovat a zprovoznit jen servisní služba Miele ne-
bo pověřený specializovaný prodejce.
Sušička musí být nainstalována vsouladu splatnými předpisy a
normami.
Sušičku provozujte vždy jen vdostatečně větraných místnostech,
které nejsou ohrožené mrazem.
Elektrické připojení
Elektrické připojení musí provést kvalifikovaný elektrikář.
Elektrické připojení smí být provedeno jen kelektrické instalaci
provedené podle národních zákonů, nařízení a směrnic jakož imíst-
ních ustanovení a předpisů. Kromě toho je nutno respektovat předpi-
sy dodavatelů energií a pojistitelů, bezpečnostní předpisy a uznávaná
pravidla techniky.
Spolehlivý a bezpečný provoz sušičky je zaručen pouze tehdy,
pokud je přístroj připojen kveřejné rozvodné síti.
Potřebné přípojné elektrické napětí, příkon a specifikace pro jištění
jsou uvedeny na typovém štítku sušičky. Než provedete elektrické
připojení, přesvědčte se, že přípojné napětí souhlasí snapěťovými
údaji na typovém štítku!
Při odlišných hodnotách napětí hrozí nebezpečí, že se sušička poš-
kodí příliš vysokým přípojným napětím.
Pokud je na typovém štítku uvedeno více hodnot napětí, je možné
sušičku přepnout pro připojení na příslušné vstupní napětí. Toto
přepnutí smí provést jen servisní služba Miele nebo pověřený specia-
lizovaný obchod. Při přepínání je nutno změnit zapojení kabelů podle
schématu zapojení.
Sušičku je možné elektricky připojit buď pevně, nebo přes zásuvku
podle IEC60309-1. Pro pevné připojení musí být vmístě instalace
kdispozici odpojovací zařízení odpojující všechny póly sítě.
Za odpojovací zařízení sítě se považují vypínače se vzdáleností roz-
pojených kontaktů větší než 3mm. Patří knim např. proudové
chrániče, jističe a stykače (IEC/EN60947).
Odpojovací zařízení sítě (včetně zástrčky) musí být zajištěné proti
neúmyslnému a neautorizovanému zapnutí, jestliže nelze zkaždého
přístupového místa kontrolovat trvalé přerušení přívodu energie.
cs - Pokyny kinstalaci
15
Tip: Přednostně by sušička měla být připojena na zástrčku, aby se
daly snadněji provádět zkoušky elektrické bezpečnosti (např. při
údržbě nebo opravě).
Nesmí se instalovat zařízení, která sušičku automaticky vypnou
(např. časové spínače).
Jestliže je podle místních předpisů nutné nainstalovat proudový
chránič FI (RCD), musí být povinně použit chránič typuB (citlivý na
všechny proudy).
cs - Pokyny kinstalaci
16
Připojení na plyn (jen pro plynem vytápěné varianty)
Připojení na plyn smí provést jen autorizovaný instalatér a musí při
tom dodržet specifické národní předpisy (viz instalační návod).
Vzhledem kpříliš malému průtoku není při uvedeném topném výkonu
přípustné použití plynové zásuvky.
Plynové topení je zvýroby nastavené podle plynotechnických údajů
na nálepce na zadní straně přístroje.
Při změně druhu plynu je nutné vyžádat si uservisní služby
přestavnou sadu (uveďte typ přístroje, číslo přístroje a druh plynu,
skupinu plynu, přípojný tlak a zemi instalace). Dbejte instalačního ná-
vodu. Tuto přestavbu smí provést jen autorizovaný odborník.
Přívod vzduchu/odtah
Sušička smí být provozována jen tehdy, když je řádně připojené od-
tahové potrubí a je postaráno odostatečné větrání místnosti.
Součásti příslušenství se smí namontovat a vestavět jen tehdy,
když jsou výslovně schválené společností Miele. Pokud budou
namontovány nebo vestavěny jiné díly, zaniká veškerá záruka nebo
ručení poskytované společností Miele.
cs - PDR914/514, plynem vytápěné
17
Rozměry
906
900 >20>20
Ø 520
650
1400
595 Ø 630
20
1400
752 642
38
67
852
747
1300
1300
747
852
900
906
< 180°
Rozměry vmilimetrech
cs - PDR914/514, plynem vytápěné
18
Instalace
620 280
90
G
501
305
1600
150
305
1600
~ 50
2 x
150
128
200
EL
AL ZL
ZL
EL
AL
501
G
G
ZL
EL
AL
AL
ZL
161
160
"Z"
"Y"
"Y"
"Z"
XCI
96
31
~350 54
128
Rozměry vmilimetrech
PL elektrický přípoj
Gplynová přípojka
AL přípojka odtahu
ZL přívod vzduchu
XCI XCIBox/připojovací skříňka (volitelně)
cs - PDR914/514, plynem vytápěné
19
Umístění (standard/UG)
20
1400
Ø 12
1400
UG
UG 900
B
~ 48
55
747
~ 55
127
Ø 10
~ 65
B
1300
55
790
395
754
900
546
BB
A
A
UG 685
409
818
587
617
B
B
B
BB
B
A - A B - B
Rozměry vmilimetrech
Bbod upevnění/vyvrtaná díra
UG podstavec, uzavřený
cs - PDR914/514, plynem vytápěné
20
Umístění (betonový sokl)
20
1400
M6 x 20
1400
BS
900
B
~ 48
>55
BS >900
>50
20
Ø 10
B
BS 1300
>55
790
395
754
BS >900
546
BB
C
C
747
463
926
546
651
D
D
B
BB
B
>50
BS
1300
790
55 55
103
395
BS
~55
OFFSHORE
C - C D - D ~ 48
Rozměry vmilimetrech
Bbod upevnění/vyvrtaná díra
BS betonový sokl
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64

Miele PDR 514 ROP Installation Plan

Typ
Installation Plan
Táto príručka je tiež vhodná pre

V iných jazykoch